Overview
This includes a functionality test of all key switches, batteries, light fittings and control equipment
The following minimum inspections and tests shall be carried out at the intervals recommended below.
Monthly emergency lighting tests
All emergency lighting systems must be tested monthly. The test is a short functional test in accordance with BS 5266-1: 2011
The period of simulated failure should be sufficient for the purpose of this test whilst minimising damage to the system components e.g. lamps. During this period, all luminaires and signs shall be checked to ensure that they are present, clean and functioning correctly. A record of the test must be recorded in the emergency lighting log book.